Asset Valuation - Replacement Unit Rates 2024/25

Financial Year: 2024/25
Version: 1.09
Released: 8 April 2025
Comments: 

Structure TypeUnit Cost m/m2
Bridge: Vehicular (single span)
£10,301.82
Bridge: Vehicular (2 or 3 spans)    
£7,388.35
Bridge: Vehicular (4 or more spans)
£5,271.83
Bridge: Pedestrian/Cycle (single span)
£6,274.90 
Bridge: Pedestrian/Cycle (multi-span)
£3,765.59
Cantilever Road Sign
£142,959.40
Chamber/Cellar/Vault
£7,148.13
Culvert (single cell)
£7,367.25
Culvert (multi-cell)
£3,684.44
High Mast Lighting
£42,887.17
Retaining Wall (height > 3m)
£3,497.78
Retaining Wall (height ≤ 3m)
£2,622.93
Sign/Signal Gantry [cantilever]
£14,294.64
Sign/Signal Gantry [spanning]
£14,294.64
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height > 3m)
£1,280.63
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height ≤ 3m)
£1,712.37
Underpass: Vehicular
£12,866.31
Underpass (or Subway): Pedestrian
£6,938.75
Subway: Pipe
£7,148.13
Tunnel (bored)
£32,166.60
Tunnel (cut and cover)
£21,444.40