Asset Valuation - Replacement Unit Rates 2021/22

Financial Year: 2021/22
Version: 1.05

Structure TypeUnit Cost m/m2
Bridge: Vehicular (single span)
£ 8,187.78
Bridge: Vehicular (2 or 3 spans)    
£ 5,872.18
Bridge: Vehicular (4 or more spans)
£ 4,189.99
Bridge: Pedestrian/Cycle (single span)
£ 4,987.23
Bridge: Pedestrian/Cycle (multi-span)
£ 2,992.85
Cantilever Road Sign
£ 113,622.65
Chamber/Cellar/Vault
£ 5,681.26
Culvert (single cell)
£ 5,855.41
Culvert (multi-cell)
£ 2,928.35
High Mast Lighting
£ 34,086.28
Retaining Wall (height > 3m)
£ 2,780.00
Retaining Wall (height ≤ 3m)
£ 2,084.68
Sign/Signal Gantry [cantilever]
£ 11,361.23
Sign/Signal Gantry [spanning]
£ 11,361.23
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height > 3m)
£ 1,017.83
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height ≤ 3m)
£ 1,360.97
Underpass: Vehicular
£ 10,226.01
Underpass (or Subway): Pedestrian
£ 5,514.85
Subway: Pipe
£ 5,681.26
Tunnel (bored)
£ 25,565.68
Tunnel (cut and cover)
£ 17,043.78