Asset Valuation - Replacement Unit Rates 2020/21

Financial Year: 2020/21
Version: 1.04 (26th May 2021)

Structure TypeUnit Cost m/m2
Bridge: Vehicular (single span)
£ 7,741.17
Bridge: Vehicular (2 or 3 spans)    
£ 5,551.88
Bridge: Vehicular (4 or more spans)
£ 3,961.45
Bridge: Pedestrian/Cycle (single span)
£ 4,715.20
Bridge: Pedestrian/Cycle (multi-span)
£ 2,829.61
Cantilever Road Sign
£ 107,425.25
Chamber/Cellar/Vault
£ 5,371.37
Culvert (single cell)
£ 5,536.03
Culvert (multi-cell)
£ 2,768.62
High Mast Lighting
£ 32,227.03
Retaining Wall (height > 3m)
£ 2,628.36
Retaining Wall (height ≤ 3m)
£ 1,970.97
Sign/Signal Gantry [cantilever]
£ 10,741.53
Sign/Signal Gantry [spanning]
£ 10,741.53
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height > 3m)
£ 962.31
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height ≤ 3m)
£ 1,286.74
Underpass: Vehicular
£ 9,668.23
Underpass (or Subway): Pedestrian
£ 5,214.04
Subway: Pipe
£ 5,371.37
Tunnel (bored)
£ 24,171.19
Tunnel (cut and cover)
£ 16,114.12