Asset Valuation - Replacement Unit Rates 2017/18

Financial Year: 2017/18
Version: 307 (29th June 2018)
 
Structure Type Unit Cost m/m2
Bridge: Vehicular (single span)
£ 7,324.34 
Bridge: Vehicular (2 or 3 spans)    
£ 5,252.94
Bridge: Vehicular (4 or more spans)
£ 3,748.14
Bridge: Pedestrian/Cycle (single span)
£ 4,461.30
Bridge: Pedestrian/Cycle (multi-span)
£ 2,677.24
Cantilever Road Sign
£ 101,640.63
Chamber/Cellar/Vault
£ 5,082.15
Culvert (single cell)
£ 5,237.93
Culvert (multi-cell)
£ 2,619.54
High Mast Lighting
£ 30,491.73
Retaining Wall (height > 3m)
£ 2,486.84
Retaining Wall (height ≤ 3m)
£ 1,864.84
Sign/Signal Gantry [cantilever]
£ 10,163.14
Sign/Signal Gantry [spanning]
£ 10,163.14
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height > 3m)
£ 910.49
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height ≤ 3m)
£ 1,217.45
Underpass: Vehicular
£ 9,147.63
Underpass (or Subway): Pedestrian
£ 4,933.28
Subway: Pipe
£ 5,082.15
Tunnel (bored)
£ 22,869.66
Tunnel (cut and cover)
£ 15,246.44
 
sourced: CIPFA.org - Code of Practice on Local Authority Transport Infrastructure Assets - Supporting Documents