To view the risk intervals for each structure first click Inspections then Inspection Scheduling (Risk Based)
Click the Review Risk Based PI Interval tab.
Each structure will show with a Risk Score Category, a Proposed Interval Action and Risk-Based PI Interval.
Click the View link in the Calculations column to see the workings for the interval proposals.
Article ID: 275, Created: 12/18/2017 at 3:55 PM, Modified: 7/20/2018 at 3:35 PM